Introduction of the process shortening effect of the FK mesh panel method for continuous reinforced concrete pavement.
Introducing the "Reinforced Concrete Pavement Reinforcement Installation Method."
The continuous reinforcement installation for the area to be poured in one day is completed in one day by introducing the FK mesh panel method.
NETIS Registration Number: CG-160007-VE
NETIS Utilization Evaluation: Promoted Utilization Technology
This method reduces the risk of delays due to adverse weather conditions. Additionally, it decreases the burden on workers during operations in extreme heat, allowing for a reduction of approximately 70% in the construction schedule.
【Delivery Achievements】
■ Shin-Tomei Expressway, Shinshiro Pavement Construction
■ Hamada-Misumi Road, Shirasuna District Pavement Construction
■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Osaka side)
■ Nabeyatoge Road, Nabeyatoge Tunnel Pavement Construction (Wakayama side)
■ Tottori Expressway, Sabuchi Tunnel Pavement Construction, etc.
*For more details, please refer to the PDF document or feel free to contact us.